Home » Uncategorized » Plot 7B Allotment Update 29.3.13 / 30.3.13

Plot 7B Allotment Update 29.3.13 / 30.3.13

Wow! What a last couple of days! Finally got to build the greenhouse!

On the 29th, I managed to build the frame, on my own, and make it stable.

ImageImageImage

Image

ImageImageImageImageImage

ImageImage

Image

The ground had been prepped and kept as dry as possible.

The plan is to lay slabs and stand wooden battens on the slabs to create a raised bed scenario.

I started to assemble the frame on the 29th and finished putting the roof on, on the 30th.Image

I now have to secure the wooden battens to the slabs and the greenhouse to the battens.  The glass is waiting to be cleaned and the we will glaze the building and plan the floor space.

We plan to grow from the soil as well as having hanging tomatoes growing in there.

So glad that at last the green house is up and almost ready for action.

Leave a comment